{"id":1341,"date":"2019-09-26T09:24:47","date_gmt":"2019-09-26T15:24:47","guid":{"rendered":"http:\/\/accesstomexico.mx\/blog\/?p=1341"},"modified":"2019-09-27T09:26:21","modified_gmt":"2019-09-27T15:26:21","slug":"wind-energy-in-mexico-vestas-wind-turbines-for-168-mw-wind-farm","status":"publish","type":"post","link":"https:\/\/accesstomexico.mx\/blog\/wind-energy-in-mexico-vestas-wind-turbines-for-168-mw-wind-farm\/","title":{"rendered":"Wind energy in Mexico: Vestas wind turbines for 168 MW wind farm."},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1342 aligncenter\" src=\"http:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2019\/09\/ENERGY-ING-2-1-300x166.jpg\" alt=\"\" width=\"300\" height=\"166\" srcset=\"https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2019\/09\/ENERGY-ING-2-1-300x166.jpg 300w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2019\/09\/ENERGY-ING-2-1-520x288.jpg 520w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2019\/09\/ENERGY-ING-2-1-360x199.jpg 360w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2019\/09\/ENERGY-ING-2-1-250x138.jpg 250w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2019\/09\/ENERGY-ING-2-1-100x55.jpg 100w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2019\/09\/ENERGY-ING-2-1.jpg 672w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><a href=\"https:\/\/www.evwind.es\/2019\/09\/26\/wind-energy-in-mexico-vestas-wind-turbines-for-168-mw-wind-farm\/71060\" target=\"_blank\" rel=\"noopener noreferrer\">REVE<\/a><\/p>\n<p style=\"text-align: justify;\">Vestas has secured a 168 MW order for a wind farm in Mexico. The order derives from a corporate power purchase agreement (PPA) and includes the supply and installation of 42 wind turbines of the 4 MW platform with V150 rotors. The order also includes an Active Output Management 5000 (AOM 5000) service agreement for the operation and maintenance of the wind park over the next five years.<\/p>\n<p style=\"text-align: justify;\">The 73-metre long blades of the Vestas 150m rotors will be locally manufactured in the TPI Composites factory in Matamoros, which provides Vestas with blades for the increasing number of V136 and V150 orders that the company is receiving in Mexico and Latin America. The wind turbine towers will also be produced by local suppliers.<\/p>\n<p style=\"text-align: justify;\">\u201cThis order showcases how Vestas\u2019 technology can meet the increasing demand of private Mexican companies for clean, reliable and competitive energy\u201d, says Agust\u00edn S\u00e1nchez-Tembleque, General Manager of Vestas M\u00e9xico.<\/p>\n<p style=\"text-align: justify;\">Vestas pioneered the Mexican wind energy market when it installed the first commercial wind turbine in 1994. Since then, Vestas has accumulated over 2,3 GW of installed capacity or under construction in the country.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>REVE Vestas has secured a 168 MW order for a wind farm in Mexico. The order derives from a corporate power purchase agreement (PPA) and includes the supply and installation of 42 wind turbines of the 4 MW platform with [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1341","post","type-post","status-publish","format-standard","hentry","category-uncategorized","clearfix"],"_links":{"self":[{"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/posts\/1341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/comments?post=1341"}],"version-history":[{"count":1,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/posts\/1341\/revisions"}],"predecessor-version":[{"id":1343,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/posts\/1341\/revisions\/1343"}],"wp:attachment":[{"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/media?parent=1341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/categories?post=1341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/tags?post=1341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}