{"id":2722,"date":"2020-09-22T11:10:02","date_gmt":"2020-09-22T17:10:02","guid":{"rendered":"http:\/\/accesstomexico.mx\/blog\/?p=2722"},"modified":"2020-09-24T11:13:02","modified_gmt":"2020-09-24T17:13:02","slug":"repsol-selects-drilling-contractor-for-mexico-campaign","status":"publish","type":"post","link":"https:\/\/accesstomexico.mx\/blog\/repsol-selects-drilling-contractor-for-mexico-campaign\/","title":{"rendered":"Repsol Selects Drilling Contractor for Mexico Campaign."},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"582\" height=\"327\" src=\"https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2020\/09\/ENERGY-ING-1-1.png\" alt=\"\" class=\"wp-image-2723\" srcset=\"https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2020\/09\/ENERGY-ING-1-1.png 582w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2020\/09\/ENERGY-ING-1-1-300x169.png 300w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2020\/09\/ENERGY-ING-1-1-520x292.png 520w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2020\/09\/ENERGY-ING-1-1-360x202.png 360w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2020\/09\/ENERGY-ING-1-1-250x140.png 250w, https:\/\/accesstomexico.mx\/blog\/wp-content\/uploads\/2020\/09\/ENERGY-ING-1-1-100x56.png 100w\" sizes=\"auto, (max-width: 582px) 100vw, 582px\" \/><\/figure>\n\n\n\n<p><a href=\"https:\/\/www.rigzone.com\/news\/repsol_selects_drilling_contractor_for_mexico_campaign-22-sep-2020-163359-article\/\" target=\"_blank\" rel=\"noreferrer noopener\">RIGZONE<\/a><\/p>\n\n\n\n<p>Stena Drilling reported Monday that it has signed a new contract with Repsol (OTCMKTS: REPYY) and others to provide a drillship for a 2021 offshore Mexico drilling campaign.<\/p>\n\n\n\n<p>The Stena IceMAX will operate in Block 29 in Mexico\u2019s Salina Basin, the drilling contractor noted in a written statement. Stena Drilling added that Repsol Exploracion Mexico S.A. De C.V.\u2019s partners in the campaign \u2013 slated to begin in May\/June 2021 \u2013 include Petronas unit PC Carigali Mexico Operations, S.A. De C.V., Wintershall Dea subsidiary Sierra Nevada E&amp;P, S. De R.L. De C.V. and PTTEP Mexico E&amp;P Limited, S. De R.L. De C.V.<\/p>\n\n\n\n<p>\u201cStena Drilling is delighted to be working with Repsol and its partners, and look forward to completing a safe and efficient drilling campaign together,\u201d the company stated.<\/p>\n\n\n\n<p>As Rigzone reported in May of this year, operator Repsol and its partners struck oil at the Polok-1 and Chinwol-1 wells in Block 29 approximately 55 miles (88 kilometers) off the coast of Mexico\u2019s Tabasco state.<\/p>\n\n\n\n<p>Repsol reported on May 4 the Block 29 discoveries are approximately 7.5 miles (12 kilometers) from each other in approximately 1,969 feet (600 meters) of water. Polok-1 hit more than 200 meters of net oil pay from two lower Miocene zones and Chinwol-1 encountered more than 150 meters of net pay from three lower Pliocene zones, the operator pointed out.<\/p>\n\n\n\n<p><strong>Matthew V. Veazey. (2020). Repsol Selects Drilling Contractor for Mexico Campaign. USA.&nbsp;<em>RIGZONE.&nbsp;<\/em>Recuperado de&nbsp;<\/strong><\/p>\n\n\n\n<p><a href=\"https:\/\/www.rigzone.com\/news\/repsol_selects_drilling_contractor_for_mexico_campaign-22-sep-2020-163359-article\/\">https:\/\/www.rigzone.com\/news\/repsol_selects_drilling_contractor_for_mexico_campaign-22-sep-2020-163359-article\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>RIGZONE Stena Drilling reported Monday that it has signed a new contract with Repsol (OTCMKTS: REPYY) and others to provide a drillship for a 2021 offshore Mexico drilling campaign. The Stena IceMAX will operate in Block 29 in Mexico\u2019s Salina [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2722","post","type-post","status-publish","format-standard","hentry","category-uncategorized","clearfix"],"_links":{"self":[{"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/posts\/2722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/comments?post=2722"}],"version-history":[{"count":1,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/posts\/2722\/revisions"}],"predecessor-version":[{"id":2724,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/posts\/2722\/revisions\/2724"}],"wp:attachment":[{"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/media?parent=2722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/categories?post=2722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/accesstomexico.mx\/blog\/wp-json\/wp\/v2\/tags?post=2722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}